Each delay in railway traffic timetables results in tremendous planning and logistic effort. Thus, the MOOG tunnel inspection systems focus on as efficient an assignment of personnel as possible and fast operational readiness of the system. Benefits, which are decisive not only for rail operation but also in application for road tunnels.
The MOOG TUA 1600 T with the reliable interchangeable carrier system more than satisfies these demands. With a flexible platform and three working platforms, the complete tunnel area can be covered with only one single sequence of operation.
Fast and efficient with optimal labour utilisation. The well-proven lift technology of the MBL-type series is used as tunnel equipment in three sizes. The working heights can be turned and adjusted in height continuously in almost any direction.
Notre site web utilise des cookies conformément à notre politique de confidentialité. Ceux-ci nous aident à optimiser l'expérience utilisateur. Vous pouvez vous opposer à l'utilisation de cookies sur ce site web à tout moment dans notre déclaration de protection des données.