MBI 180-1,7/S to REITINGER
The Wilhelm Reitinger GmbH & CO. KG Company, which has been a customer of MOOG for decades and already owns numerous under-bridge units, has commissioned a large trailer unit with several additional options that was handed over to the customer at the end of March 2017.
The platform unit MBI 180-1,7/S was mounted on a fully air-suspended 3-axle chassis, where one axle is steerable. 2 additional support axles provide the required stability in operation. The machine has a horizontal range of up to 18.0 m under the bridge as standard, but this can be increased up to 21.0 m by using the additionally supplied platform extensions (1.0 m / 2.0 m). The platform has a width of 1.7 m and can be loaded simultaneously with up to 6 people plus 320 kg of material (max. 800 kg).
The extensive additional equipment is the special feature of this under-bridge unit:
The machine was additionally equipped with an elevating and lifting frame, which can lift the entire upper structure flexibly and giving it the ability to cross – sound barriers of up to 5.4 m.
The additionally supplied radio remote control allows a better overview of the work area, especially in those hard-to-see places, and ensures the required freedom of movement only wireless control of the machine can provide.
In addition to the radio remote control, the platform unit has been equipped with an automatic steering system, which allows the unit to be operated by only one person from the work platform. The trailer is secured in place by an ultrasound, light barriers and an additional camera system. Independently guided by means of sensing arms that guide along the bridge (e.g. crash barriers), which transmit the corresponding movements to the steering system.
With the help of the hydraulic loading crane installed on the chassis, any required material or additional equipment needed can be lifted comfortably from the bridge deck down onto the platform. This crane can also be operated with a radio remote control.
The hydraulic alplift with a standing height of 6.0 m, the two supplied scaffoldings, the LED night lights and the wind warning device installed on the tower complete the equipment package for this under-bridge unit.
However, the customer can not only use the additional equipment supplied with this unit, but even the pier inspection platform of his existing machine. For this purpose, corresponding features for being able to use the pier inspection device were installed on the platform of this MBI 180-1,7/S.
Versatile use with a wide range of additional equipment –
MOOG under-bridge access solutions!