{"id":5845,"date":"2018-07-05T18:59:49","date_gmt":"2018-07-05T16:59:49","guid":{"rendered":"https:\/\/www.moog-online.com\/non-classifiee\/mbi-145-14-s-fuer-lorenz-lift-in-oesterreich\/"},"modified":"2019-03-14T10:50:29","modified_gmt":"2019-03-14T09:50:29","slug":"mbi-145-14-s-for-lorenz-lift-in-austria","status":"publish","type":"post","link":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/","title":{"rendered":"MBI 145-1,4\/S for Lorenz Lift in Austria"},"content":{"rendered":"<p>[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_column_text]<\/p>\n<h2>MBI 145-1,4\/S for Lorenz Lift in Austria<\/h2>\n<p>A new MBI 145-1,4\/S was handed over to a long-time Austrian customer at the end of June 2018, increasing their current mobile under-bridge equipment fleet.<\/p>\n<p>The MOOG MBI 145-1,4\/S upper structure was mounted on SCANIA\u2019s newest version of their facelift chassis. It came equipped with a platform providing a maximum horizontal reach of 14.5 m under the bridge, which can be extended to 15.75 m when using the additional platform extension. This unit has a lowering depth of up to 9.5 m and a maximum weight capacity throughout the platform of 600 kg.<\/p>\n<p>The unit also includes two portable scaffolds, which can be combined into three different versions and used on the base and\/or the telescopic platform, providing better access into hollow box girders. The scaffold\u2019s various positioning abilities allow for flexible adaptation to the conditions on the underside of the bridge, which enables working heights of 4.0 m and 5.0 m respectively.<\/p>\n<p>Another special request from this customer was that the unit is equipped with an elevating frame to cross higher sound barriers, so this unit is able cross barriers that are up to 4.1 m high.<\/p>\n<p>Even though MOOG\u2019s units are very compact and are able to be erected and operated in just one lane of the road, sometimes this is just not enough. In today\u2019s modern world of fast-paced travel many bridges are overflowing with a high volume of traffic during the day. So to prevent more congestion during the peak travel time, high traffic bridges are now only allowing work on them throughout the night. As this machine would be working in such an area it was very important to the customer that it came equipped with night lighting, which ensures safe platform access in low light and dark working times.<\/p>\n<p>Training took place at the MOOG facilities at the end of June 2018 and was driven to the customers facilities afterwards.[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner][vc_gallery type=\u00a0\u00bbimage_grid\u00a0\u00bb images=\u00a0\u00bb1179,1184,1189,1194,1199,1204&Prime; img_size=\u00a0\u00bblarge\u00a0\u00bb][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_column_text] MBI 145-1,4\/S for Lorenz Lift in Austria A new MBI 145-1,4\/S was handed over to a long-time Austrian customer at the end of June 2018, [&hellip;]<\/p>\n<p class=\"read-more\">Lire la suite<i class=\"icon-right-open\"><\/i><\/p>\n","protected":false},"author":2,"featured_media":1197,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[],"class_list":["post-5845","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-non-classifiee"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>MBI 145-1,4\/S for Lorenz Lift in Austria - MOOG Br\u00fcckenzugangstechnik - Under Bridge Access Solutions<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MBI 145-1,4\/S for Lorenz Lift in Austria - MOOG Br\u00fcckenzugangstechnik - Under Bridge Access Solutions\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_column_text] MBI 145-1,4\/S for Lorenz Lift in Austria A new MBI 145-1,4\/S was handed over to a long-time Austrian customer at the end of June 2018, [&hellip;]Lire la suite\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/\" \/>\n<meta property=\"og:site_name\" content=\"MOOG\" \/>\n<meta property=\"article:published_time\" content=\"2018-07-05T16:59:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-03-14T09:50:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.moog-online.com\/wp-content\/uploads\/2019\/03\/04_mbi145_lorenz.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Patrick Kleiner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Patrick Kleiner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/\"},\"author\":{\"name\":\"Patrick Kleiner\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#\\\/schema\\\/person\\\/a6812b956884b23310c535f11452f2a8\"},\"headline\":\"MBI 145-1,4\\\/S for Lorenz Lift in Austria\",\"datePublished\":\"2018-07-05T16:59:49+00:00\",\"dateModified\":\"2019-03-14T09:50:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/\"},\"wordCount\":377,\"publisher\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.moog-online.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/04_mbi145_lorenz.jpg\",\"articleSection\":[\"Non classifi\u00e9(e)\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/\",\"url\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/\",\"name\":\"MBI 145-1,4\\\/S for Lorenz Lift in Austria - MOOG Br\u00fcckenzugangstechnik - Under Bridge Access Solutions\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.moog-online.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/04_mbi145_lorenz.jpg\",\"datePublished\":\"2018-07-05T16:59:49+00:00\",\"dateModified\":\"2019-03-14T09:50:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.moog-online.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/04_mbi145_lorenz.jpg\",\"contentUrl\":\"https:\\\/\\\/www.moog-online.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/04_mbi145_lorenz.jpg\",\"width\":1920,\"height\":1440},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/non-classifiee\\\/mbi-145-14-s-for-lorenz-lift-in-austria\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.moog-online.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MBI 145-1,4\\\/S for Lorenz Lift in Austria\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#website\",\"url\":\"https:\\\/\\\/www.moog-online.com\\\/\",\"name\":\"MOOG\",\"description\":\"Br\u00fcckenzugangstechnik - Under Bridge Access Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.moog-online.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#organization\",\"name\":\"MOOG GmbH Br\u00fcckenzugangstechnik - Under Bridge Access Solutions\",\"url\":\"https:\\\/\\\/www.moog-online.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"MOOG GmbH Br\u00fcckenzugangstechnik - Under Bridge Access Solutions\"},\"image\":{\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.moog-online.com\\\/#\\\/schema\\\/person\\\/a6812b956884b23310c535f11452f2a8\",\"name\":\"Patrick Kleiner\",\"sameAs\":[\"https:\\\/\\\/www.tellerrnd.de\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MBI 145-1,4\/S for Lorenz Lift in Austria - MOOG Br\u00fcckenzugangstechnik - Under Bridge Access Solutions","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/","og_locale":"fr_FR","og_type":"article","og_title":"MBI 145-1,4\/S for Lorenz Lift in Austria - MOOG Br\u00fcckenzugangstechnik - Under Bridge Access Solutions","og_description":"[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_column_text] MBI 145-1,4\/S for Lorenz Lift in Austria A new MBI 145-1,4\/S was handed over to a long-time Austrian customer at the end of June 2018, [&hellip;]Lire la suite","og_url":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/","og_site_name":"MOOG","article_published_time":"2018-07-05T16:59:49+00:00","article_modified_time":"2019-03-14T09:50:29+00:00","og_image":[{"width":1920,"height":1440,"url":"https:\/\/www.moog-online.com\/wp-content\/uploads\/2019\/03\/04_mbi145_lorenz.jpg","type":"image\/jpeg"}],"author":"Patrick Kleiner","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Patrick Kleiner","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#article","isPartOf":{"@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/"},"author":{"name":"Patrick Kleiner","@id":"https:\/\/www.moog-online.com\/#\/schema\/person\/a6812b956884b23310c535f11452f2a8"},"headline":"MBI 145-1,4\/S for Lorenz Lift in Austria","datePublished":"2018-07-05T16:59:49+00:00","dateModified":"2019-03-14T09:50:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/"},"wordCount":377,"publisher":{"@id":"https:\/\/www.moog-online.com\/#organization"},"image":{"@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#primaryimage"},"thumbnailUrl":"https:\/\/www.moog-online.com\/wp-content\/uploads\/2019\/03\/04_mbi145_lorenz.jpg","articleSection":["Non classifi\u00e9(e)"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/","url":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/","name":"MBI 145-1,4\/S for Lorenz Lift in Austria - MOOG Br\u00fcckenzugangstechnik - Under Bridge Access Solutions","isPartOf":{"@id":"https:\/\/www.moog-online.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#primaryimage"},"image":{"@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#primaryimage"},"thumbnailUrl":"https:\/\/www.moog-online.com\/wp-content\/uploads\/2019\/03\/04_mbi145_lorenz.jpg","datePublished":"2018-07-05T16:59:49+00:00","dateModified":"2019-03-14T09:50:29+00:00","breadcrumb":{"@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#primaryimage","url":"https:\/\/www.moog-online.com\/wp-content\/uploads\/2019\/03\/04_mbi145_lorenz.jpg","contentUrl":"https:\/\/www.moog-online.com\/wp-content\/uploads\/2019\/03\/04_mbi145_lorenz.jpg","width":1920,"height":1440},{"@type":"BreadcrumbList","@id":"https:\/\/www.moog-online.com\/fr\/non-classifiee\/mbi-145-14-s-for-lorenz-lift-in-austria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.moog-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"MBI 145-1,4\/S for Lorenz Lift in Austria"}]},{"@type":"WebSite","@id":"https:\/\/www.moog-online.com\/#website","url":"https:\/\/www.moog-online.com\/","name":"MOOG","description":"Br\u00fcckenzugangstechnik - Under Bridge Access Solutions","publisher":{"@id":"https:\/\/www.moog-online.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.moog-online.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.moog-online.com\/#organization","name":"MOOG GmbH Br\u00fcckenzugangstechnik - Under Bridge Access Solutions","url":"https:\/\/www.moog-online.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.moog-online.com\/#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"MOOG GmbH Br\u00fcckenzugangstechnik - Under Bridge Access Solutions"},"image":{"@id":"https:\/\/www.moog-online.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.moog-online.com\/#\/schema\/person\/a6812b956884b23310c535f11452f2a8","name":"Patrick Kleiner","sameAs":["https:\/\/www.tellerrnd.de"]}]}},"_links":{"self":[{"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/posts\/5845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/comments?post=5845"}],"version-history":[{"count":1,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/posts\/5845\/revisions"}],"predecessor-version":[{"id":5848,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/posts\/5845\/revisions\/5848"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/media\/1197"}],"wp:attachment":[{"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/media?parent=5845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/categories?post=5845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moog-online.com\/fr\/wp-json\/wp\/v2\/tags?post=5845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}